History

Каталог 1

  

Каталог 2


All products presented on the site are made by Vodopribor Plant.

Directing water to the right channel since 1892!

Plant history 

Alekseevsk Pumping Station of Mytishchi Water Pipeline was opened in October 1892, the date of establishment of Vodopribor Plant.


October 1892

Alekseevsk Pumping Station of Mytishchi Water Pipeline was opened (date of establishment of Vodopribor Plant).

1913

Repair workshops of Alekseevsk Pumping Station were transformed into a mechanical repair plant.

1917

Alekseevsk Pumping Station and Mechanical Repair Plant were transferred to the control of the Utility Services Department of the Moscow Council of Workers’, Peasants’ and Soldiers’ Deputies.

1933

Alekseevsk Station and Mechanical Repair Plant merged into one company Oremznasos (Joint Department of Mechanical Repair Plant and Pumping Station named after V.V. Oldenborger), which was subordinated to the water trust of Moscow Soviet.

1935

Launch of the production of the first water meters in Russia.

1937

The cast shop was built and put into operation.

1938

Oremznasos was renamed into Cast and Mechanical Plant of Plumbing Equipment and Devices - VODOPRIBOR.

1968

The induction crucible furnaces were installed.

1983

Vodopribor Plant of Mosvodokanal Trust was transformed into AP Vodopribor Plant.

1991

Vodopribor Plant of Mosvodokanal Trust was transformed into AP Vodopribor Plant.

1995

AP Vodopribor Plant was reorganized into Vodopribor Plant, OAO (Open Joint-Stock Company); magnetic and mechanical filters for water purification from suspended particles  and ferromagnets were developed.

1997

Fully updated range of water meters for hot and cold water.

1999

Launch of production of SKB-20 (СКБ-20) domestic flow meters.

2004

The production of water meters SKB nominal bore 25, 32, 40, (СКБ Dу 25, 32, 40) which replaced the water meters OSV nominal bore 25, 32, 40, (ОСВ Dу 25, 32, 40) as well as a combined KVM water meter was mastered.

2006

The production of new types of TMR (ТМР) cast-iron hatches with shut-off mechanism, shutters of disk rotary coupling locks (ЗДС), locks of reverse locking OZS (ОЗС), ultrasonic water meter “IRVIS”, VMT-100 (ВМТ-100) plunger was mastered.

2007

The production of valves with rubber-wedge MZVP (МЗВП), MZVSh (МЗВШ) was mastered.

2008

The production of turbine water meter VH (ВХ) was mastered.

2009

The production of valves with rubber-wedge and electric drive MZVPR-100 (МЗВПР-100) was mastered.

2010

Launch of production of water meters in brass body for the special design bureau.

2011

Launch of the housing vane water meters SH-15 (СХ-15) and SG-15 (СГ-15) Vodomer.

2013

Launch of production of valves with rubber wedge ZVK (ЗВК).

2014

Launch of the release of Automated meter reading and control systems ASKUEVodopribor Uchet.

2015

Start of serial production of Turbine Water Meter VV-50 (ВВ-50) with hydrodynamically unloaded turbine.

2016
Start of the supply of commercially available turbine water meters VV-50 with a hydrodynamically unloaded turbine to Moscow water supply facilities.
2017
Successful implementation of ASKUE (Automated meter reading and control systems) Vodopribor Uchet in the city of Kaluga, based on its own wireless solutions.
2018

Start of serial production of the line of turbine water meters VVT Du50-Du200 (ВВТ Ду50-Ду200) with hydrodynamically unloaded turbine and non-magnetic principle of operation.